Determining the dates for "Received," "Revised," and "Accepted" in article.

16-12-2024

Determining the dates for "Received," "Revised," and "Accepted" is as follows:

  1. Received: Use the date when the editor assigns the article to a handling editor 
  2. Revised: Use the date of the latest revision in the system.
  3. Accepted: Use the date when the article is accepted in the system.